Text
Panen lele 2,5 bulan hasil 1 ton lele dari kolam 50 m2
Description Not Available
9282-2009 | 639.31 BAS | Perpustakaan Poltek AUP kampus Bogor | Available |
1524-2013 | 639.31 BAS | Perpustakaan Poltek AUP kampus Bogor | Available |
1525-2013 | 639.31 BAS | Perpustakaan Poltek AUP kampus Bogor | Available |
1622-2013 | 639.31 BAS p | Perpustakaan Poltek AUP kampus Bogor | Available |
No other version available